At the first kind in the region will do a considering building, Abu Dhabi will committed to source 7 per cent of his power within nine years.
There is more pressure to do many works until 2020, and they should generate more energy from the light breezes.
At this time there are two energy companies: Masdar owned by Mubadala
, Strategic owned by Abu Dhabi government, Emirate’s Ambitious, also new plants being, 1- Shams and 2- Noor and both of them have 100 megawatts solar projects.
The doctors said many information’s about the number of Megawatts and there are two industry executives familiar with the project.
The reasons that the wind is higher, its adding optimum case, Masdar should make a contract early to send power to the grid, and that will make a good result.
Grid connections need good land and wind, in golf the wind power its more challenging than solar power, UAE may have problem because they have nature wind.
2 million need to install each megawatt of wind power and 200 million to build proposed plant, the financing relies the government will pay the difference between cost of solar and grid prices.
The wind plants need a similar subsidy to more forward because it is wind not solar m it is the first project of its kind
Name: Mohamed Mabkhoot Alnahdi
ID Number: H00211340
CLA
Word: 233
No comments:
Post a Comment